Timeline Guide: How Long Does Renovation Take?
Home renovations are exciting β but also full of moving parts. Whether you’re revamping a cozy kitchen or doing a full bathroom overhaul, knowing how long things take helps manage expectations, budgets, and stress.
β±οΈ Spoiler: Even βsmallβ updates often take longer than expected without proper planning.
π Typical Renovation Timelines (Kitchen & Bath Focused)
π§ Project Type | β³ Estimated Duration |
---|---|
Basic kitchen update (paint, fixtures) |
1β2 weeks |
Full kitchen remodel | 4β8 weeks |
Half bathroom refresh | 1 week |
Full bathroom remodel | 3β5 weeks |
Kitchen + bath combo remodel | 6β10 weeks |
π Note: Add extra time for design, permits, shipping delays, or surprise issues behind the walls.
π οΈ Phases of a Renovation Project
Breaking the process into stages helps things flow smoothly:
1οΈβ£ Planning & Design (2β4 weeks)
π¨ Layout planning, material selection, mood boards, contractor interviews.
2οΈβ£ Permits & Ordering (1β3 weeks)
π Permit applications, product sourcing, vendor confirmations.
3οΈβ£ Demolition (2β5 days)
π§Ή Tear-down of old cabinets, tiles, appliances.
4οΈβ£ Plumbing & Electrical (3β7 days)
π‘ Rerouting pipes and wiring to fit the new layout.
5οΈβ£ Framing & Drywall (4β7 days)
πͺ Any new walls, niches, or bulkheads go up now.
6οΈβ£ Flooring & Tiling (5β10 days)
π§± Backsplashes, bathroom tiles, or waterproof flooring.
7οΈβ£ Cabinetry & Fixtures (1β2 weeks)
π° Installation of cabinets, sinks, faucets, lights.
8οΈβ£ Finishing Touches (2β4 days)
πΌοΈ Paint, trim, caulk, mirror hanging, and final cleanup.
β Real-Life Factors That Cause Delays
πΈ Material backorders (especially custom cabinets)
πΈ Permit approval slowdowns
πΈ Hidden plumbing/electrical issues
πΈ Scheduling conflicts with contractors
πΈ Last-minute design changes
π― Pro tip: Pad your timeline by at least 15β20% to keep stress low.
π§ Final Thoughts
Patience pays off in renovation. A realistic, well-thought-out timeline ensures youβre not living in a construction zone forever. Whether you’re updating a kitchen for modern cooking or turning a bathroom into a personal spa, time spent planning = time saved later.